Finish coordination is the act of designing and documenting how adjacent materials meet so junctions read as deliberate, tolerate movement, and can be built repeatedly without improvisation on site. In practice, this means: (1) choosing a clear hierarchy of datum lines (top of finished floor, door head, ceiling plane, tile module), (2) deciding where you want visual breaks (reveals, trims, shadow gaps), and (3) placing movement/transition devices (thresholds, expansion joints) where they are least visually disruptive and most effective.
Core detailing principles (use these before drawing any junction)
1) Establish datum lines and alignments
- Primary datum: Top of Finished Floor (TFF). Use it to control skirting heights, tile set-out, cabinetry toe-kicks, and door undercuts.
- Secondary datums: ceiling plane (TFC), door head line, window sill line, and a wall module (e.g., 600 mm) for tile/panel set-out.
- Rule: If two elements are meant to read as one composition (e.g., wall panels and doors), align their reveals and horizontal joints to the same datum.
2) Reveal sizing and tolerance budgeting
Reveals (shadow gaps, negative joints) are not just aesthetic; they are tolerance absorbers. Size them to accommodate substrate variation, trade sequencing, and movement.
- Typical interior reveals: 6–10 mm for crisp shadow lines; 10–15 mm when you need more tolerance (long runs, multiple trades meeting).
- Flatness reality: Floors and walls are rarely perfectly straight; a 3 mm reveal can disappear with a slightly bowed wall. If you want a consistent line, do not undersize.
- Document tolerances: Note acceptable substrate tolerances (e.g., wall plumbness/flatness) and where the reveal is intended to “take up” variation.
3) Sequencing with trades (design for build order)
- Wet trades first: screeds, waterproofing, tile backer boards, plaster/gypsum finishing.
- Then frames and carriers: door frames, recessed skirting carriers, ceiling perimeter trims.
- Then finishes: flooring, wall finishes, skirting/trim, sealants.
- Rule: If a detail requires a hidden carrier (recessed skirting, flush trims), it must be installed before final plaster/paint and before flooring is locked in.
Floor-to-wall conditions
Floor-to-wall junctions must address: (1) floor movement and expansion, (2) cleaning and durability at the base of the wall, and (3) visual continuity.
A) Surface-mounted baseboards (standard skirting)
Best when you need robustness, easy replacement, and tolerance coverage.
- Where it works well: corridors, high-traffic areas, retrofit conditions, uneven walls.
- Key decisions: height, thickness, profile (square vs. eased), and whether it aligns with door architraves.
- Buildability notes: allow for floor expansion gap behind skirting; specify sealant at top edge only if required (avoid trapping moisture at bottom in wet areas).
Step-by-step detailing:
- Listen to the audio with the screen off.
- Earn a certificate upon completion.
- Over 5000 courses for you to explore!
Download the app
- Set TFF and confirm floor build-up thickness.
- Decide expansion gap at perimeter (commonly 8–12 mm depending on flooring type and room size).
- Choose skirting thickness that covers the gap plus tolerance (e.g., 15–18 mm thick skirting covers a 10 mm gap with margin).
- Coordinate with door casing: either return skirting into casing, or align heights for a clean termination.
- Specify fixing method (adhesive + pins/screws) and paint/finish system.
B) Recessed skirting (shadow gap at base)
Creates a floating wall effect and protects the wall face from kicks if a durable recessed profile is used. It requires early coordination and good substrate control.
- Where it works well: open plan living areas, gallery-like spaces, minimalist interiors.
- Common systems: metal recessed skirting profiles, gypsum recess with metal edge bead, or a proprietary carrier with removable insert.
- Critical coordination: wall thickness, stud alignment, plaster thickness, and floor finish thickness must be known early.
Step-by-step detailing:
- Pick a target shadow gap (e.g., 10 mm) and recess depth (e.g., 15–20 mm) based on cleaning needs and visual intent.
- Confirm wall build-up: studs/blocks + plasterboard/plaster thickness so the recess lands correctly.
- Specify the recessed profile/carrier and its fixing to framing or masonry.
- Coordinate floor finish thickness so the gap remains consistent after flooring installation (avoid a gap that becomes too small once floor is laid).
- Detail corners: decide mitered metal corners vs. factory corner pieces; avoid fragile gypsum-only corners in high traffic.
- Document sequencing: carrier/profile installed before plaster finish; flooring installed after wall finishing but before final touch-up paint.
C) Flush base (flush skirting or flush wall-to-floor)
Flush details make the wall plane continuous, but they are the least forgiving. Use when you can control tolerances and you have a clear reason (e.g., flush wall panels, integrated doors).
- Options: flush timber skirting set into a wall recess; flush metal trim; wall finish continuing to floor with a protective edge.
- Risk: any floor movement or wall irregularity becomes visible; cleaning equipment can damage the wall finish if no protective edge exists.
Practical guidance: If you want a flush look, still include a deliberate joint: a 6–10 mm shadow gap or a slim metal edge trim is usually more buildable than a “perfectly tight” junction.
Wall-to-ceiling conditions
Wall-to-ceiling junctions control how the room “caps” visually and how you accommodate ceiling deflection, lighting coves, and service coordination.
A) Shadow gap at ceiling perimeter
A perimeter shadow gap separates wall and ceiling planes, hides minor movement/deflection, and creates a crisp line that can align with other reveals.
- Typical gap: 10–15 mm for consistent shadow; smaller gaps are harder to keep even.
- Coordination: requires a perimeter trim or shadow bead; coordinate with curtain tracks, sprinklers, and linear lighting so the gap is not interrupted randomly.
Step-by-step detailing:
- Decide if the ceiling is “floating” (gap) or “closed” (trim/cornice).
- Choose a shadow bead system compatible with gypsum board thickness.
- Set a ceiling datum (TFC) and ensure door heads, window heads, and bulkheads relate intentionally (either align or clearly offset).
- Coordinate paint: often ceiling and wall are different sheens; the shadow gap helps mask the paint transition.
B) Trims and cornices (intentional closure)
Trims can protect edges and hide tolerances, but they introduce a visible element that must be proportioned and repeated consistently.
- Use when: you need to conceal unevenness, integrate traditional language, or provide a robust edge in high-maintenance spaces.
- Coordination: align trim heights with other horizontal lines (top of doors, top of wall panels) or keep it clearly separate to avoid “almost aligned” awkwardness.
C) Gypsum transitions: bulkheads, drops, and service zones
Bulkheads often exist for ducts, beams, curtain tracks, or lighting. The finish coordination task is to make the transition read as designed rather than accidental.
- Principle: if a ceiling drop is required, either (1) align it with a plan geometry (wall line, grid line, joinery line), or (2) make it a continuous band that wraps the space.
- Edge treatment: use a consistent reveal or trim at the drop edge; avoid random stepped soffits unless they follow a clear service logic.
Changes of plane and key transitions
A) Inside/outside corners and material returns
- Inside corners: decide whether the finish wraps (tile return, panel return) or stops with a trim. Wrapping reads higher quality but needs set-out control.
- Outside corners: protect with metal corner trims, durable beads, or solid material returns. Avoid fragile paint-only corners in public/high traffic zones.
- Rule: if a material stops at a corner, stop it with a deliberate edge (trim/reveal), not a thin feathered termination.
B) Thresholds and door undercuts
Thresholds solve three common problems: (1) different floor finishes meeting, (2) different floor thicknesses, and (3) movement joints at doorways.
- Flush threshold: best for accessibility; requires careful leveling and often a reducer profile concealed under the door leaf line.
- Raised threshold: can help with water control (wet rooms) but must be justified and coordinated with accessibility requirements.
- Door undercut: coordinate with final floor thickness and any rugs; typical undercut allowances vary, but you must dimension it from TFF, not from structural slab.
Step-by-step: detailing a clean doorway transition
- List the two adjacent floor finishes and their total build-ups (finish + adhesive/underlay + screed if applicable).
- Decide the meeting line: under the door leaf centerline is common so each room “owns” its finish.
- If thickness differs, choose: (a) build up the thinner side with leveling compound, (b) use a reducer profile, or (c) introduce a threshold strip sized to the difference.
- Place any expansion/movement joint at the doorway where it is naturally broken by the frame/leaf.
- Detail the threshold section: show heights from TFF, fixing method, and sealant lines (especially near wet areas).
C) Expansion joints and movement accommodation
Movement is inevitable (thermal, moisture, structural deflection). Your job is to locate joints where they are least visible and easiest to maintain.
- Where to place: at large floor areas, at changes in substrate, at doorways, at transitions between heated/unheated zones, and where manufacturer guidance requires.
- How to express: either conceal under trims/thresholds or express as a consistent joint line aligned with a datum (e.g., a corridor centerline or tile grid).
- Sealants: specify joint width and sealant type; avoid “fill with grout” where movement is expected.
D) Changes in flooring thickness (common problem set)
Thickness changes are most visible at transitions and at fixed elements (baseboards, cabinetry, stair nosings). Solve them by planning build-ups early and choosing one of three strategies.
| Strategy | How it works | Best for | Watch-outs |
|---|---|---|---|
| Level the substrate | Use screed/leveling compound to bring thin finish up | Flush transitions, accessibility | Impacts door heights, skirting, thresholds; drying time |
| Use transition profiles | Reducer/T-bar/edge trims manage height difference | Retrofits, mixed finishes | Profile becomes a visible design element; coordinate color/metal |
| Introduce a threshold element | A deliberate strip/stone saddle bridges both | Doorways, wet/dry separation | Can read dated if overused; must align with door/frame |
Scenario-based layouts (how coordination decisions change by plan type)
Scenario 1: Open plan (living/dining/kitchen)
Goal: make large continuous areas feel calm; minimize random breaks; hide movement joints within intentional lines.
- Recommended approach: choose one dominant floor finish for the main field; if kitchen needs a different finish, align the transition with a joinery line (e.g., island edge) or a ceiling datum (bulkhead line) so it reads intentional.
- Floor-to-wall: recessed skirting or a clean square skirting works well; keep height consistent across the open plan.
- Wall-to-ceiling: use a perimeter shadow gap or a consistent trim; coordinate with curtain pockets and linear lighting so the perimeter line is uninterrupted.
- Movement joints: if required in large floor areas, align them with tile/grid lines or place under a long joinery run where possible.
Mini-layout exercise: Mark on plan: (1) the primary floor field, (2) any secondary floor zones, (3) the exact transition line location, (4) the threshold/profile type, and (5) where the expansion joint is concealed or expressed.
Scenario 2: Corridor (repetition, durability, and alignment)
Goal: maintain straight, repeatable junctions over long runs; manage door-to-door transitions consistently.
- Recommended approach: establish a corridor datum: a continuous skirting line and a continuous ceiling edge condition (shadow gap or trim). Keep reveal sizes identical along the run.
- Door thresholds: standardize a single threshold detail for all room entries; place the finish change under the door leaf centerline.
- Wall protection: consider robust baseboards and corner protection at trolley impact zones; coordinate with wall finish so protection reads integrated (not an afterthought).
- Ceiling transitions: if services require drops, make them continuous bands rather than localized bumps.
Mini-layout exercise: Create a “typical doorway kit of parts”: threshold detail + skirting termination + door frame relation + ceiling line at the door head. Repeat it for every door unless there is a documented exception.
Scenario 3: Wet core (bathrooms, pantries, utility)
Goal: control water, allow cleaning, and coordinate waterproofing terminations with finish edges.
- Wet/dry separation: place a threshold or linear drain strategy intentionally; if using a threshold, align it with the door and detail it as a water stop.
- Floor-to-wall: tiled skirting (tile base) or a compatible waterproof skirting detail; avoid porous MDF baseboards in wet zones.
- Wall-to-ceiling: decide tile height termination (full height vs. partial). If partial, terminate with a trim aligned to a datum (mirror top, door head, or a consistent height across all wet rooms).
- Movement joints: use sealant joints at changes of plane (floor-to-wall, wall-to-wall) rather than grout; coordinate joint width with tile module.
Mini-layout exercise: On the wet core plan, mark: waterproofing extents, tile set-out direction, all changes of plane requiring sealant joints, and the exact location/type of wet/dry threshold.
Required learner output: Transition Plan (what to draw and annotate)
Produce a single coordinated Transition Plan (one plan drawing per level or per zone) that identifies every finish change and how it is detailed. The plan should be readable by builders and should reduce on-site decisions.
Transition Plan checklist
- Legend: finish codes for floors, walls, ceilings; threshold/profile types; movement joint types.
- Mark every change line: floor finish transitions, wall finish transitions (e.g., tile to paint), ceiling condition changes (bulkhead edges), and any datum/reveal lines that must align.
- Tag each transition: e.g.,
T-01doorway threshold,J-02expansion joint,R-01perimeter shadow gap. - Reference details: each tag points to a section detail number (1:5 or 1:10 typical) showing build-ups, reveal size, and fixings.
- Heights and levels: note TFF and any step/ramps; call out floor thickness differences where they occur.
- Sequencing notes: identify transitions requiring early installation (recessed skirting carriers, shadow beads, door frames before plaster).
Minimum set of details to accompany the plan
- Floor-to-wall: one detail each for surface skirting, recessed skirting, and a robust corner condition.
- Wall-to-ceiling: one shadow gap detail and one bulkhead edge detail.
- Threshold: one flush transition and one wet/dry threshold (if applicable).
- Expansion joint: one expressed joint and one concealed-at-doorway joint.
Example tag format on plan: T-01 = Flush doorway transition (timber to tile), reducer profile concealed under door leaf, movement joint at centerline. Detail: 5/A-601