Visibility, Tracking, and Performance Management in Daily Operations

Capítulo 10

Estimated reading time: 9 minutes

+ Exercise

What “Visibility” Means in Daily Transportation Operations

Visibility is the ability to answer, at any moment: Where is the shipment, what is its status, what will happen next, and what is the risk of missing the plan? Tracking is the collection of time-stamped events (milestones) that describe progress. Performance management is the discipline of turning those events into measurable outcomes (KPIs), then using a repeatable review cadence to improve results with carriers and internal teams.

Operational visibility works best when you standardize three things: (1) a shared milestone map across modes and carriers, (2) clear ownership for each event and exception, and (3) a small KPI set that is reviewed consistently.

Milestones and What to Track at Each Stage

Use a single “shipment timeline” with stages that apply to most moves (even if the physical process differs by mode). Each stage should have: planned time, actual time, data source, and exception rules.

1) Pre-pickup (before the driver arrives)

Goal: confirm the shipment is truly ready and the carrier is truly committed.

  • Order released to ship (internal): shipment created, references correct (PO, SO, load ID), ship-from/ship-to validated.
  • Appointment confirmed (shipper/warehouse): pickup window agreed; include dock door if applicable.
  • Tender accepted (carrier): acceptance timestamp and service level confirmed.
  • Equipment/driver assigned (carrier): tractor/trailer/container number when available; driver contact if policy allows.
  • Pre-alert / shipping instructions sent (internal to warehouse and consignee): what is shipping, when, and any handling constraints.
  • Ready-to-load confirmation (warehouse): freight staged, labels applied, paperwork available.

Early-risk signals to watch:

Continue in our app.
  • Listen to the audio with the screen off.
  • Earn a certificate upon completion.
  • Over 5000 courses for you to explore!
Or continue reading below...
Download App

Download the app

  • Missed pickup risk: tender not accepted within target time; no equipment assigned by a cutoff; appointment not confirmed.
  • Readiness risk: “ready-to-load” not confirmed; inventory short; staging incomplete close to pickup window.

2) In-transit (linehaul movement)

Goal: keep ETA credible and detect disruptions early.

  • Departed origin: actual departure time (gate-out or “loaded and departed”).
  • Location pings: GPS/ELD updates or carrier check calls at a defined frequency (e.g., every 2–4 hours for high-priority loads).
  • ETA updates: recalculated ETA with timestamp and reason code when changed.
  • Exception events: breakdown, weather delay, hours-of-service constraint, refused at facility, security hold.
  • Temperature/condition telemetry (if applicable): min/max, excursions, door open events.

Early-risk signals to watch:

  • Route deviation: location pings diverge from expected corridor beyond a threshold (e.g., >10–20 miles off route) without a documented reason.
  • Late ETA: ETA slips beyond the delivery appointment buffer; repeated ETA changes indicate instability.
  • “Silent” shipment: no location update beyond a maximum interval; treat as an exception until re-established.

3) At terminal/port (handoff, cross-dock, or node dwell)

Goal: control dwell time and prevent missed connections.

  • Arrived at node: actual arrival time (gate-in).
  • Received / unloaded: freight physically received; count/condition noted.
  • Customs/inspection status (if applicable): hold/release events.
  • Connection planned: next departure time, vessel/train/linehaul ID, cutoff times.
  • Departed node: actual departure time (gate-out).

Early-risk signals to watch:

  • Dwell risk: time at node exceeds threshold (e.g., >12 hours at cross-dock, >48 hours at port—set by your network norms).
  • Missed connection: arrival after cutoff; no confirmed next leg; “rolled” to later departure.

4) Out for delivery (final-mile execution)

Goal: protect the appointment and ensure the consignee is ready.

  • Out for delivery: vehicle dispatched; stop sequence known if multi-stop.
  • Delivery appointment reconfirmed: same-day confirmation for tight windows.
  • Geofence arrival: arrival at consignee area; check-in time.
  • Unloading start/end: if you track detention/dwell at consignee.

Early-risk signals to watch:

  • Late-day risk: out-for-delivery starts too late to meet window given distance and stop count.
  • Consignee readiness risk: appointment changes, facility congestion alerts, or prior dwell trend at that location.

5) Delivered (proof and closure)

Goal: close the shipment cleanly and capture service/cost outcomes.

  • Delivered: actual delivery timestamp.
  • POD captured: proof of delivery (signature, photo, electronic confirmation) and any exceptions noted.
  • Shortage/damage noted: exception codes, photos, seal status, count discrepancies.
  • Charges validated: accessorial triggers (detention, re-delivery, liftgate, etc.) supported by timestamps and documentation.

Early-risk signals to watch:

  • Delivery exception: refused, closed, no appointment, missing paperwork—these often create re-delivery cost and service failure.
  • Claims risk: damage/shortage noted at delivery; missing photos or seal data increases dispute risk.

Building an Event Milestone Map (Practical Step-by-Step)

  1. Define your standard milestones using the five stages above. Keep the list short enough that carriers can comply (often 12–20 total events).
  2. Assign an owner and data source for each milestone (carrier EDI/API, GPS provider, warehouse scan, port system, manual entry). Document which is “system of record.”
  3. Set planned vs. actual fields for each milestone. Planned times come from appointments and schedules; actual times come from events.
  4. Create exception rules (thresholds) that trigger alerts. Example: “Tender not accepted within 30 minutes” or “No tracking update for 4 hours.”
  5. Define reason codes for exceptions so you can analyze patterns later (e.g., shipper not ready, carrier capacity, traffic, weather, facility congestion).
  6. Test with a pilot group of lanes/carriers, then expand. Validate that alerts are actionable (not noise).

Using Milestones to Spot Risk Early

Milestones are most valuable when they predict failure early enough to intervene. The table below shows common risks and the earliest milestone that can detect them.

RiskEarliest detection pointWhat to checkTypical intervention
Missed pickupPre-pickup: tender accepted / equipment assignedAcceptance time, driver assignment, appointment confirmationEscalate to carrier dispatch; secure backup capacity; adjust pickup window; prioritize loading
Dwell at terminal/portNode arrival + dwell timerCutoff times, holds, connection planExpedite release; rebook connection; prioritize dray/cross-dock; communicate revised ETA
Route deviationIn-transit: GPS ping vs. corridorDeviation distance/time, detour reasonContact driver/carrier; update ETA; reroute; notify consignee if appointment at risk
Late ETAIn-transit: ETA update trendETA slip frequency, remaining distance, HOS constraintsReschedule appointment; swap driver; expedite; adjust dock plan
Delivery failure (refused/closed)Out for delivery: appointment reconfirmedReceiving hours, PO readiness, paperwork requirementsConfirm receiving; send documents; change delivery date; avoid re-delivery charges

Simple KPI Dashboard Structure (Daily/Weekly)

A useful dashboard answers: Are we spending what we expected, and are we delivering as promised? Keep KPIs consistent across carriers and lanes, then allow drill-down by customer, facility, mode, and carrier.

Core KPI tiles (recommended)

  • Cost per shipment = total transportation cost / number of shipments. Use consistent inclusions (linehaul + accessorials + fuel, as defined internally).
  • Cost per mile = total transportation cost / loaded miles (or total miles if you track them consistently). Use the same mileage source across carriers.
  • On-time delivery (OTD) = deliveries on or before appointment window end / total deliveries. Define “on-time” clearly (e.g., within 30 minutes of appointment).
  • Claims rate = number of claims (or claim $) / shipments (or freight value). Track both frequency and severity.
  • Dwell = average time at key nodes (origin dwell, terminal/port dwell, consignee dwell). Report as average and % above threshold.
  • Tender acceptance = accepted tenders / total tenders. Also track time to accept for operational responsiveness.

Dashboard layout (one-page)

  • Top row: KPI tiles with current period vs. target and vs. last period.
  • Middle row: trend lines (weekly) for OTD, cost per shipment, dwell.
  • Bottom row: Pareto charts (top 10) for: lanes driving cost, facilities driving dwell, carriers driving late deliveries, top exception reason codes.

Operational definitions (avoid KPI disputes)

Write definitions directly on the dashboard or in a linked glossary. Example:

On-time delivery = Delivered timestamp <= Appointment end time + 30 minutes grace. Excludes: customer-requested reschedules documented before out-for-delivery.

Performance Review Cadence and Meeting Structure

Daily (internal operations huddle, 15–30 minutes)

  • Inputs: shipments at risk today (late ETA, missed pickup, dwell alerts), high-value/high-priority loads, “silent” tracking.
  • Outputs: owner assigned per exception, next action, and time for next update.
  • Rule: focus on exceptions only; do not rehash normal shipments.

Weekly (carrier ops call, 30–60 minutes per key carrier)

  • Scorecard review: OTD, tender acceptance, dwell, claims, top exception reasons by lane/facility.
  • Lane-level deep dive: pick 1–3 problem lanes or facilities; review specific loads and timestamps.
  • Commitments: corrective actions with due dates (e.g., earlier driver assignment, improved tracking frequency, appointment process changes).

Monthly (business review with carriers and internal stakeholders, 60–90 minutes)

  • Trend and target review: month-to-date and rolling 3-month performance vs. targets.
  • Cost and service drivers: accessorial patterns, dwell hotspots, network changes affecting performance.
  • Improvement roadmap: process changes, technology integration, facility training needs.

Quarterly (strategic review)

  • Network fit: where the carrier performs best/worst; capacity reliability; escalation effectiveness.
  • Joint projects: dwell reduction at specific sites, tracking integration upgrades, exception automation.

Root-Cause Categories (Use Consistent Codes)

To make reviews productive, classify exceptions into a small set of root-cause categories. Keep the list stable so trends are meaningful.

CategoryExamplesTypical evidence
Shipper readinessFreight not staged, paperwork missing, late load completionWarehouse timestamps, ready-to-load confirmation, dock logs
Carrier executionLate arrival, no-show, tracking gaps, missed appointmentDispatch notes, GPS pings, check-in times
Consignee constraintsRefused, closed, appointment unavailable, long unload timesAppointment records, POD notes, dwell timestamps
Terminal/port/node congestionRolled connection, long queue, holdsGate-in/out times, node status messages
External disruptionWeather, road closure, security incidentPublic alerts, carrier incident reports, reroute records
Data/process qualityWrong address, missing reference, incorrect appointment timeTMS audit trail, master data logs, change history

Corrective-Action Documentation (Practical Step-by-Step)

Use a simple corrective-action record for any recurring issue or high-impact failure. The goal is to document facts, assign ownership, and verify effectiveness.

  1. Describe the event: shipment ID, lane, dates, what happened (use milestone timestamps).
  2. Quantify impact: late minutes/hours, extra cost, customer impact, claim amount if any.
  3. Assign root-cause category: pick from the standard list; add a short narrative.
  4. Identify contributing factors: appointment lead time, facility dwell trend, tracking gaps, cutoff miss.
  5. Define corrective action: specific change (process, training, system rule, carrier commitment).
  6. Assign owner and due date: one accountable person per action (carrier and/or internal).
  7. Define verification method: what metric should improve and how you will measure it (e.g., reduce origin dwell >2 hours from 18% to 8% on Lane X).
  8. Track status: open/in progress/complete; attach evidence (screenshots, logs, emails, POD).

Example corrective-action record (template)

Issue: Missed pickup on Lane DAL->HOU (Shipment 84721) on 2026-01-12. Impact: +1 day late, $350 rework. Root cause: Carrier execution. Contributing factors: Tender accepted but no driver assigned by cutoff; no proactive alert. Action: Carrier to assign driver within 2 hours of acceptance for this lane; TMS alert if no assignment by 4pm day prior. Owner: Carrier ops manager / Internal transportation lead. Due: 2026-01-26. Verify: Missed pickups on lane reduced to 0 for 4 weeks; tender-to-assignment time median < 90 minutes.

Now answer the exercise about the content:

Which approach best improves operational visibility and performance management in daily transportation operations?

You are right! Congratulations, now go to the next page

You missed! Try again.

Visibility improves when milestones are standardized, each event and exception has an owner and data source, and a small KPI set is reviewed consistently to drive corrective actions with carriers and internal teams.

Next chapter

Putting It Together: Mode, Carrier, and Route Selection Frameworks

Arrow Right Icon
Free Ebook cover Transportation Management Basics: Choosing Modes, Carriers, and Routes
91%

Transportation Management Basics: Choosing Modes, Carriers, and Routes

New course

11 pages

Download the app to earn free Certification and listen to the courses in the background, even with the screen off.